ITAC Assessment: UM0020
ITAC logo
ITAC Assessment: UM0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Board
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 75,000
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,636 1,392,732
kWh
Natural Gas $37,503 9,537
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $445 $747 $445
6,448
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,545 $6,937 $3,545
52,169
kWh
-
03 2.7131: Add area lighting switches $5,032 $2,000 $5,032
73,857
kWh
-
04 2.2122: Install / repair insulation on condensate lines $411 $356 - $411
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $1,280 $180 - $1,280
-
MMBtu
06 2.1213: Direct warmest air to combustion intake $144 $200 - $144
-
MMBtu
TOTAL RECOMMENDED $10,857 $10,420 $9,022
132,474
kWh
$1,835
-
MMBtu
TOTAL IMPLEMENTED $10,857 $10,420 $9,022
132,474
kWh
$1,835
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs