ITAC Assessment: OK0255
ITAC logo
ITAC Assessment: OK0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PIPELINE SERVICE EQUIPMENT
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,280
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,354 2,867,233
kWh
Natural Gas $37,324 11,590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,196

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $11,528 $12,900 - $11,528
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,134 $8,160 $2,273
55,979
kWh
- $861
03 2.7123: Keep lamps and reflectors clean $7,590 $21,879 $6,431
128,370
kWh
- $1,159
04 2.7142: Utilize higher efficiency lamps and/or ballasts $612 $756 $612
12,309
kWh
- -
05 2.2437: Recover waste heat from equipment $1,196 $1,105 - $1,196
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $668 - $728
23,447
kWh
- $(-60.0)
TOTAL RECOMMENDED $24,728 $44,800 $10,044
220,105
kWh
$12,724
-
MMBtu
$1,960
TOTAL IMPLEMENTED $12,196 $12,900 $728
23,447
kWh
$11,528
-
MMBtu
$(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs