| Assessment Year | 1988 |
|---|---|
| Principal Product | PIPELINE SERVICE EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 7,280
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $141,354 | 2,867,233 |
kWh
|
$0.049 |
| Natural Gas | $37,324 | 11,590 |
MMBtu
|
$3.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,728 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,196 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $11,528 | $12,900 | - |
$11,528
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,134 | $8,160 |
$2,273
55,979
kWh
|
- | $861 | |
| 03 | 2.7123: Keep lamps and reflectors clean | $7,590 | $21,879 |
$6,431
128,370
kWh
|
- | $1,159 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $612 | $756 |
$612
12,309
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $1,196 | $1,105 | - |
$1,196
-
MMBtu
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $668 | - |
$728
23,447
kWh
|
- | $(-60.0) | |
| TOTAL RECOMMENDED | $24,728 | $44,800 |
$10,044
220,105
kWh
|
$12,724
-
MMBtu
|
$1,960 | ||
| TOTAL IMPLEMENTED | $12,196 | $12,900 |
$728
23,447
kWh
|
$11,528
-
MMBtu
|
$(-60.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs