ITAC Assessment: UL2608
ITAC logo
ITAC Assessment: UL2608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wood Staves and Heading
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2429: Special Product Sawmills, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 84,100
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,663 765,791
kWh
Electricity Demand $10,128 1,409
kW-mo/yr
Electricity Fees $14,755 -
Waste Disposal Costs
Water Usage $7,631 516,138
Tgal
TOTAL YEARLY COSTS $81,177
RECOMMENDED SAVINGS* $18,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,037 - $1,037
16,327
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,542 $540 $1,542
24,279
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,730 $4,875 $2,730
42,959
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,290 - $1,290
20,308
kWh
-
05 2.9114: Use solar heat to make electricty $12,174 $174,076 $10,009
157,507
kWh
$2,165
-
kW-mo/yr
TOTAL RECOMMENDED $18,773 $179,491 $16,608
261,380
kWh
$2,165
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs