| Assessment Year | 2026 |
|---|---|
| Principal Product | Plastic Panels |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 80 |
| Plant Area |
134,000
ft2
|
| Annual Production | 40,000,000
units
|
| Production Hrs. Annual | 3,456
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,200 | 2,112,573 |
kWh
|
$0.057 |
| Electricity Demand | $167,673 | 8,050 |
kW-mo/yr
|
$20.83 |
| Electricity Fees | $44,108 | - |
|
- |
| Natural Gas | $132,116 | 23,384 |
MMBtu
|
$5.65 |
| TOTAL YEARLY COSTS | $465,097 | |||
| RECOMMENDED SAVINGS* | $53,744 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $32,940 | $282,326 |
$20,109
350,331
kWh
|
$12,831
-
kW-mo/yr
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $430 | - |
$190
3,318
kWh
|
$240
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $152 | $312 |
$152
2,654
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,834 | $1,680 |
$4,834
84,218
kWh
|
- | - | |
| 05 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $1,315 | $6,435 | - | - |
$1,315
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $14,073 | $37,025 | - | - |
$14,073
-
MMBtu
|
|
| TOTAL RECOMMENDED | $53,744 | $327,778 |
$25,285
440,521
kWh
|
$13,071
-
kW-mo/yr
|
$15,388
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs