ITAC Assessment: UL2517
ITAC logo
ITAC Assessment: UL2517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Plastic Panels
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 134,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 3,456
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,200 2,112,573
kWh
Electricity Demand $167,673 8,050
kW-mo/yr
Electricity Fees $44,108 -
Natural Gas $132,116 23,384
MMBtu
TOTAL YEARLY COSTS $465,097
RECOMMENDED SAVINGS* $53,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $32,940 $282,326 $20,109
350,331
kWh
$12,831
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $430 - $190
3,318
kWh
$240
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $152 $312 $152
2,654
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,834 $1,680 $4,834
84,218
kWh
- -
05 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,315 $6,435 - - $1,315
-
MMBtu
06 2.2437: Recover waste heat from equipment $14,073 $37,025 - - $14,073
-
MMBtu
TOTAL RECOMMENDED $53,744 $327,778 $25,285
440,521
kWh
$13,071
-
kW-mo/yr
$15,388
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs