Assessment Year | 2025 |
---|---|
Principal Product | Phenol Resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $100 M to 500M |
# of Employees | 140 |
Plant Area |
2,800,000
ft2
|
Annual Production | 111,457
ton
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,310,577 | 40,762,397 |
kWh
|
$0.032 |
Electricity Demand | $1,404,108 | 66,222 |
kW-mo/yr
|
$21.20 |
Electricity Fees | $164,074 | - |
|
- |
Natural Gas | $2,007,896 | 561,817 |
MMBtu
|
$3.57 |
TOTAL YEARLY COSTS | $4,886,655 | |||
RECOMMENDED SAVINGS* | $76,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $1,784 | $3,182 |
$1,784
55,417
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,935 | $5,846 |
$3,539
109,897
kWh
|
$3,396
-
kW-mo/yr
|
|
03 | 2.2692: Use outside cold water source as a supply of cooling water | $32,007 | $43,234 |
$13,644
424,368
kWh
|
$18,363
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $965 | $525 |
$965
29,971
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,101 | $4,725 |
$2,101
65,267
kWh
|
- | |
06 | 2.9114: Use solar heat to make electricty | $32,508 | $321,604 |
$14,816
460,812
kWh
|
$17,692
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $76,300 | $379,116 |
$36,849
1,145,732
kWh
|
$39,451
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs