Assessment Year | 2025 |
---|---|
Principal Product | Plastic Parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
48,000
ft2
|
Annual Production | 10,800,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,248 | 2,624,214 |
kWh
|
$0.034 |
Electricity Demand | $219,648 | 14,708 |
kW-mo/yr
|
$14.93 |
Electricity Fees | $38,988 | - |
|
- |
Natural Gas | $9,307 | 448 |
MMBtu
|
$20.77 |
TOTAL YEARLY COSTS | $357,191 | |||
RECOMMENDED SAVINGS* | $99,506 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $223 | $168 |
$63
1,857
kWh
|
$160
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,017 | $630 |
$2,017
59,314
kWh
|
- | - | |
03 | 2.2692: Use outside cold water source as a supply of cooling water | $10,447 | $57,490 |
$5,769
169,675
kWh
|
$4,678
-
kW-mo/yr
|
- | |
04 | 2.3212: Optimize plant power factor | $45,536 | $20,280 | - | - | $45,536 | |
05 | 2.9114: Use solar heat to make electricty | $18,944 | $219,965 |
$10,421
306,427
kWh
|
$8,523
-
kW-mo/yr
|
- | |
06 | 2.4321: Upgrade obsolete equipment | $17,226 | $135,000 |
$3,886
114,251
kWh
|
$13,340
-
kW-mo/yr
|
- | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,512 | - | - |
$4,512
-
kW-mo/yr
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $601 | $2,445 |
$601
17,666
kWh
|
- | - | |
TOTAL RECOMMENDED | $99,506 | $435,978 |
$22,757
669,190
kWh
|
$31,213
-
kW-mo/yr
|
$45,536 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs