ITAC Assessment: AM0253
ITAC logo
ITAC Assessment: AM0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Alloy steel castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 247,245
ft2
Annual Production 7,200
ton
Production Hrs. Annual 1,890
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $848,974 16,808,910
kWh
Natural Gas $240,676 85,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,807 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $35,300 $92,500 $35,300
-
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,500 $3,000 $12,500
293,083
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,250 $1,000 $3,250
61,547
kWh
04 2.8121: Apply for tax-free status for energy purchases $2,860 $5,720 $2,860
-
kWh
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,170 - $1,170
26,671
kWh
06 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $727 $95 $727
12,896
kWh
TOTAL RECOMMENDED $55,807 $102,315 $55,807
394,197
kWh
TOTAL IMPLEMENTED $55,807 $102,315 $55,807
394,197
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs