Assessment Year | 2025 |
---|---|
Principal Product | Plasticware |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
90,000
ft2
|
Annual Production | 1,330,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $541,332 | 10,453,238 |
kWh
|
$0.052 |
Electricity Demand | $262,796 | 13,457 |
kW-mo/yr
|
$19.53 |
Electricity Fees | $171,788 | - |
|
- |
TOTAL YEARLY COSTS | $975,916 | |||
RECOMMENDED SAVINGS* | $313,198 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,472 | - |
$5,472
105,233
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,462 | $1,440 |
$3,462
66,579
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,347 | $574 |
$616
11,903
kWh
|
$731
-
kW-mo/yr
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $592 | - |
$385
7,434
kWh
|
$207
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $1,240 | $2,661 |
$1,240
23,937
kWh
|
- | - | |
06 | 2.2692: Use outside cold water source as a supply of cooling water | $141,151 | $58,367 |
$91,863
1,766,597
kWh
|
$49,288
-
kW-mo/yr
|
- | |
07 | 2.3212: Optimize plant power factor | $25,794 | $14,820 | - | - | $25,794 | |
08 | 2.9114: Use solar heat to make electricty | $95,468 | $929,060 |
$55,880
1,074,612
kWh
|
$39,588
-
kW-mo/yr
|
- | |
09 | 2.7292: Lower ceiling to reduce conditioned space | $38,672 | $8,000 |
$38,672
746,765
kWh
|
- | - | |
TOTAL RECOMMENDED | $313,198 | $1,014,922 |
$197,590
3,803,060
kWh
|
$89,814
-
kW-mo/yr
|
$25,794 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs