ITAC Assessment: UL2414
ITAC logo
ITAC Assessment: UL2414
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Actuators
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 220,000
ft2
Annual Production 3,500,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,363 2,834,000
kWh
Electricity Demand $188,715 7,515
kW-mo/yr
Electricity Fees $27,131 -
Natural Gas $32,177 3,413
MMBtu
TOTAL YEARLY COSTS $346,386
RECOMMENDED SAVINGS* $212,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $5,637 $7,818 - - $5,637 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,855 $3,045 $6,855
176,214
kWh
- - -
03 2.9114: Use solar heat to make electricty $121,785 $1,075,553 $51,713
1,543,672
kWh
$70,072
-
kW-mo/yr
- -
04 2.7224: Reduce space conditioning during non-working hours $3,526 $1,500 $993
28,373
kWh
- - $2,533
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $3,205 $15,000 $3,205
91,561
kWh
- - -
06 2.2692: Use outside cold water source as a supply of cooling water $71,333 $21,308 $1,232
35,203
kWh
$70,101
-
kW-mo/yr
- -
TOTAL RECOMMENDED $212,341 $1,124,224 $63,998
1,875,023
kWh
$140,173
-
kW-mo/yr
$5,637 $2,533
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs