ITAC Assessment: UL2401
ITAC logo
ITAC Assessment: UL2401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Commercial Kitchen and Cooking Equipment
NAICS 333310: Commercial and Service Industry Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 81,000
ft2
Annual Production 6,025
units
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,069 1,850,520
kWh
Electricity Demand $137,921 5,335
kW-mo/yr
Electricity Fees $42,029 -
Natural Gas $24,769 1,744
MMBtu
TOTAL YEARLY COSTS $276,788
RECOMMENDED SAVINGS* $80,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $54,908 $450,549 $24,690
634,716
kWh
$30,218
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,727 $3,600 $1,727
44,402
kWh
- - -
03 2.3212: Optimize plant power factor $17,320 $13,000 - - $17,320 -
04 2.7224: Reduce space conditioning during non-working hours $1,830 - $684
17,551
kWh
- - $1,146
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,468 $1,000 $1,189
30,567
kWh
$2,279
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,347 $2,270 $413
10,628
kWh
$933
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $191 $504 $191
4,918
kWh
- - -
TOTAL RECOMMENDED $80,791 $470,923 $28,895
742,782
kWh
$33,430
-
kW-mo/yr
$17,320 $1,146
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs