Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Repair of industrial machines
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 80,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,417 2,515,800
kWh
Electricity Demand $155,187 5,687
kW-mo/yr
Electricity Fees $37,168 -
Natural Gas $79,113 6,065
MMBtu
TOTAL YEARLY COSTS $345,885
RECOMMENDED SAVINGS* $125,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $29,804 $13,936 - - $29,804 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,821 $13,461 $1,261
42,064
kWh
$1,560
-
kW-mo/yr
- -
03 2.7243: Improve air circulation with destratification fans / other methods $20,576 $15,000 - - - $20,576
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,358 - $1,358
45,267
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,061 $4,320 $5,061
168,688
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,398 $6,825 $3,398
114,856
kWh
- - -
07 2.9114: Use solar heat to make electricty $54,095 $476,338 $20,369
688,593
kWh
$33,726
-
kW-mo/yr
- -
08 2.2692: Use outside cold water source as a supply of cooling water $2,765 $100 $2,765
92,154
kWh
- - -
09 2.2437: Recover waste heat from equipment $5,470 $15,600 - - - $5,470
-
MMBtu
TOTAL RECOMMENDED $125,348 $545,580 $34,212
1,151,622
kWh
$35,286
-
kW-mo/yr
$29,804 $26,046
-
MMBtu
TOTAL IMPLEMENTED $7,826 $4,420 $7,826
260,842
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs