ITAC Assessment: UL2310
ITAC logo
ITAC Assessment: UL2310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Filters and Filter Media
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 143
Plant Area 232,256
ft2
Annual Production 10,617,486
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $393,219 4,846,682
kWh
Electricity Demand $148,679 10,867
kW-mo/yr
Electricity Fees $53,166 -
Natural Gas $128,094 14,709
MMBtu
Waste Disposal Costs
Water Usage $17,334 37
Tgal
Water Disposal $24,889 37
Tgal
TOTAL YEARLY COSTS $765,381
RECOMMENDED SAVINGS* $313,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $145,022 $23,878 $121,046
1,494,397
kWh
$23,976
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $4,283 - $2,598
32,021
kWh
$1,685
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $159,497 $1,065,693 $121,666
1,499,617
kWh
$37,831
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,462 - $2,462
30,394
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,694 $540 $1,694
20,908
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $550 $2,438 $550
6,776
kWh
-
TOTAL RECOMMENDED $313,508 $1,092,549 $250,016
3,084,113
kWh
$63,492
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs