Assessment Year | 2023 |
---|---|
Principal Product | Copper-Nickel Alloys |
NAICS | 331110: Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
150,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $213,726 | 8,322,120 |
kWh
|
$0.026 | |
Electricity Demand | $394,121 | 18,551 |
kW-mo/yr
|
$21.25 | |
Electricity Fees | $157,720 | - |
|
- | |
Natural Gas | $464,379 | 39,639 |
MMBtu
|
$11.72 | |
Waste Disposal Costs | |||||
Water Usage | $37,018 | 7,388 |
Tgal
|
$5.01 | |
Water Disposal | $78,724 | 12,888 |
Tgal
|
$6.11 | |
TOTAL YEARLY COSTS | $1,345,688 | ||||
RECOMMENDED SAVINGS* | $183,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $53,544 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $1,100 | $2,693 |
$1,100
42,311
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,654 | $33,973 |
$6,719
306,251
kWh
|
$8,935
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,834 | - |
$1,834
70,546
kWh
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $38,660 | $22,666 | - | - | - | $38,660 | |
05 | 2.9114: Use solar heat to make electricty | $38,855 | $480,889 |
$12,347
480,748
kWh
|
$26,508
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,752 | $14,626 |
$4,752
162,006
kWh
|
- | - | - | |
07 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $36,790 | $34,740 | - | - |
$36,790
-
MMBtu
|
- | |
08 | 2.2437: Recover waste heat from equipment | $46,192 | $39,000 | - | - |
$46,192
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $183,837 | $628,587 |
$26,752
1,061,862
kWh
|
$35,443
-
kW-mo/yr
|
$82,982
-
MMBtu
|
$38,660 | ||
TOTAL IMPLEMENTED | $53,544 | $71,406 |
$7,819
348,562
kWh
|
$8,935
-
kW-mo/yr
|
$36,790
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs