ITAC Assessment: UL2302
ITAC logo
ITAC Assessment: UL2302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Head rests for Cars
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 87,000
ft2
Annual Production 55,136,008
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,246 3,397,840
kWh
Electricity Demand $193,742 8,406
kW-mo/yr
Electricity Fees $73,796 -
Natural Gas $44,843 1,135
MMBtu
Waste Disposal Costs
Water Usage $5,039 1,126,500
Tgal
Water Disposal $7,633 1,126,500
Tgal
TOTAL YEARLY COSTS $422,299
RECOMMENDED SAVINGS* $118,548 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $427 $335 $147
5,061
kWh
$280
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $149 $754 $149
5,145
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,425 - $2,362
81,463
kWh
$2,063
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,825 $960 $1,825
62,946
kWh
- - -
05 2.3212: Optimize plant power factor $30,686 $20,580 - - $30,686 -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $854 $975 $301
10,385
kWh
$553
-
kW-mo/yr
- -
07 2.2437: Recover waste heat from equipment $3,052 $8,500 - - - $3,052
-
MMBtu
08 2.9114: Use solar heat to make electricty $77,130 $820,000 $31,768
1,110,000
kWh
$45,362
-
kW-mo/yr
- -
TOTAL RECOMMENDED $118,548 $852,104 $36,552
1,275,000
kWh
$48,258
-
kW-mo/yr
$30,686 $3,052
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs