Assessment Year | 2023 |
---|---|
Principal Product | Head rests for Cars |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3465: Automotive Stampings |
Sales Range | $50 M to 100M |
# of Employees | 325 |
Plant Area |
87,000
ft2
|
Annual Production | 55,136,008
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $97,246 | 3,397,840 |
kWh
|
$0.029 | |
Electricity Demand | $193,742 | 8,406 |
kW-mo/yr
|
$23.05 | |
Electricity Fees | $73,796 | - |
|
- | |
Natural Gas | $44,843 | 1,135 |
MMBtu
|
$39.51 | |
Waste Disposal Costs | |||||
Water Usage | $5,039 | 1,126,500 |
Tgal
|
$0.004 | |
Water Disposal | $7,633 | 1,126,500 |
Tgal
|
$0.007 | |
TOTAL YEARLY COSTS | $422,299 | ||||
RECOMMENDED SAVINGS* | $118,548 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $427 | $335 |
$147
5,061
kWh
|
$280
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $149 | $754 |
$149
5,145
kWh
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,425 | - |
$2,362
81,463
kWh
|
$2,063
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,825 | $960 |
$1,825
62,946
kWh
|
- | - | - | |
05 | 2.3212: Optimize plant power factor | $30,686 | $20,580 | - | - | $30,686 | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $854 | $975 |
$301
10,385
kWh
|
$553
-
kW-mo/yr
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $3,052 | $8,500 | - | - | - |
$3,052
-
MMBtu
|
|
08 | 2.9114: Use solar heat to make electricty | $77,130 | $820,000 |
$31,768
1,110,000
kWh
|
$45,362
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $118,548 | $852,104 |
$36,552
1,275,000
kWh
|
$48,258
-
kW-mo/yr
|
$30,686 |
$3,052
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs