ITAC Assessment: UL2217
ITAC logo
ITAC Assessment: UL2217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product carpet and other underlayment materials
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 387,000
ft2
Annual Production 5,950,225
units
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,186,831 27,925,435
kWh
Electricity Demand $382,667 67,468
kW-mo/yr
Electricity Fees $396,082 -
Natural Gas $785,394 303,884
MMBtu
TOTAL YEARLY COSTS $2,750,974
RECOMMENDED SAVINGS* $128,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,769 $4,795 $4,753
111,826
kWh
$1,016
-
kW-mo/yr
- -
02 2.4131: Size electric motors for peak operating efficiency $4,739 $7,251 $931
21,915
kWh
$3,808
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,426 - $2,601
60,487
kWh
$825
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $32,626 $94,199 - - $32,626 -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,163 $19,500 $4,224
99,393
kWh
$939
-
kW-mo/yr
- -
06 2.2414: Use waste heat from hot flue gases to preheat $7,602 $50,000 - - - $7,602
-
MMBtu
07 2.9114: Use solar heat to make electricty $6,919 $102,018 $5,418
127,476
kWh
$1,501
-
kW-mo/yr
- -
08 2.2692: Use outside cold water source as a supply of cooling water $6,524 $25,900 $6,524
153,501
kWh
- - -
09 2.7313: Recycle air for heating, ventilation and air conditioning $33,279 - $33,279
783,376
kWh
- - -
10 2.7313: Recycle air for heating, ventilation and air conditioning $22,146 $30,000 - - - $22,146
-
MMBtu
TOTAL RECOMMENDED $128,193 $333,663 $57,730
1,357,974
kWh
$8,089
-
kW-mo/yr
$32,626 $29,748
-
MMBtu
TOTAL IMPLEMENTED $104,242 $193,699 $40,104
943,256
kWh
$1,764
-
kW-mo/yr
$32,626 $29,748
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs