Assessment Year | 2023 |
---|---|
Principal Product | Automotive interior carpet and inlayment |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
250,000
ft2
|
Annual Production | 1,164,949
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $147,034 | 3,486,000 |
kWh
|
$0.042 | |
Electricity Demand | $194,647 | 12,043 |
kW-mo/yr
|
$16.16 | |
Electricity Fees | $39,090 | - |
|
- | |
Natural Gas | $10,213 | 1,064 |
MMBtu
|
$9.59 | |
Waste Disposal Costs | |||||
Water Usage | $6,865 | 483 |
Tgal
|
$14.21 | |
TOTAL YEARLY COSTS | $397,849 | ||||
RECOMMENDED SAVINGS* | $119,402 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $67,238 | $1,046,392 |
$38,754
918,805
kWh
|
$28,484
-
kW-mo/yr
|
- | |
02 | 2.9114: Use solar heat to make electricty | $43,721 | $432,345 |
$25,591
606,744
kWh
|
$18,130
-
kW-mo/yr
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,475 | - |
$1,346
32,051
kWh
|
$1,129
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $626 | $3,993 |
$626
14,916
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,543 | - |
$1,543
36,574
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,187 | $1,760 |
$3,187
75,873
kWh
|
- | - | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $612 | - |
$108
2,579
kWh
|
- |
$504
-
MMBtu
|
|
TOTAL RECOMMENDED | $119,402 | $1,484,490 |
$71,155
1,687,542
kWh
|
$47,743
-
kW-mo/yr
|
$504
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs