ITAC Assessment: UL2209
ITAC logo
ITAC Assessment: UL2209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Industrial and Commercial Paint
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 596,000
ft2
Annual Production 15,634
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,374 18,055,800
kWh
Electricity Demand $753,772 32,234
kW-mo/yr
Electricity Fees $120,430 -
Natural Gas $547,312 108,710
MMBtu
TOTAL YEARLY COSTS $1,881,888
RECOMMENDED SAVINGS* $315,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,491 - $2,778
111,133
kWh
$4,713
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $129,982 $118,199 - - $129,982
03 2.9114: Use solar heat to make electricty $18,922 $259,874 $8,431
337,245
kWh
$10,491
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $106,250 $1,192,362 $33,919
1,356,766
kWh
$72,331
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $48,414 $30,522 $20,150
805,998
kWh
$28,264
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,998 $29,151 $1,750
69,986
kWh
$2,248
-
kW-mo/yr
-
TOTAL RECOMMENDED $315,057 $1,630,108 $67,028
2,681,128
kWh
$118,047
-
kW-mo/yr
$129,982
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs