ITAC Assessment: UL2207
ITAC logo
ITAC Assessment: UL2207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Metal Industrial Components
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3462: Iron and Steel Forgings
Sales Range $50
M
to 100
M
# of Employees 285
Plant Area 172,000
ft2
Annual Production 71,400,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,183,589 46,410,880
kWh
Electricity Demand $2,907,261 152,285
kW-mo/yr
Electricity Fees $49,338 -
Natural Gas $161,683 59,841
MMBtu
TOTAL YEARLY COSTS $4,301,871
RECOMMENDED SAVINGS* $376,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.8114: Change rate schedules or other changes in utility service $12,180 - - $12,180
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $31,984 $83,246 $15,533
597,435
kWh
$16,451
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,572 $18,120 $1,102
42,392
kWh
$6,470
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,876 - $3,876
149,071
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,845 $30,000 $6,845
263,260
kWh
-
06 2.9114: Use solar heat to make electricty $178,671 $2,038,848 $77,685
2,987,870
kWh
$100,986
-
kW-mo/yr
07 2.9114: Use solar heat to make electricty $135,226 $2,377,313 $58,792
2,261,237
kWh
$76,434
-
kW-mo/yr
TOTAL RECOMMENDED $376,354 $4,547,527 $163,833
6,301,265
kWh
$212,521
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs