Assessment Year | 1999 |
---|---|
Principal Product | Plastic Injection Molding |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 265 |
Plant Area |
250,000
ft2
|
Annual Production | 400,000,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $376,023 | 8,780,774 |
kWh
|
$0.043 |
Electricity Demand | $29,022 | 1,674 |
kW-mo/yr
|
$17.34 |
Electricity Fees | $51,507 | - |
|
- |
Natural Gas | $17,103 | 3,440 |
MMBtu
|
$4.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $968,139 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $22,189 | $4,604 |
$22,189
452,814
kWh
|
- | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,727 | $22,000 |
$14,350
293,083
kWh
|
$590
-
kW-mo/yr
|
$(-6,213.0)
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,256 | $7,330 |
$3,875
79,132
kWh
|
$381
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $681 | $80 |
$646
13,189
kWh
|
$35
-
kW-mo/yr
|
- | - | - | |
05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $21,492 | - | - | - | - |
$21,492
-
lb
|
- | |
06 | 3.5316: Contract a wood pallet recycling company | $6,800 | - | - | - | - |
$6,800
-
lb
|
- | |
07 | 4.514: Re-arrange equipment layout to reduce handling costs | $539,784 | $10,944 | - | - | - | - | $539,784 | |
08 | 4.514: Re-arrange equipment layout to reduce handling costs | $359,856 | $10,944 | - | - | - | - | $359,856 | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $4,354 | $157 | - | - | - | - | $4,354 | |
TOTAL RECOMMENDED | $968,139 | $56,059 |
$41,060
838,218
kWh
|
$1,006
-
kW-mo/yr
|
$(-6,213.0)
-
MMBtu
|
$28,292
-
lb
|
$903,994 | ||
TOTAL IMPLEMENTED | $38,280 | $12,171 |
$26,710
545,135
kWh
|
$416
-
kW-mo/yr
|
- |
$6,800
-
lb
|
$4,354 | ||