ITAC Assessment: UL2205
ITAC logo
ITAC Assessment: UL2205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Injection molded plastic automotive parts
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3466: Crowns and Closures
Sales Range $50
M
to 100
M
# of Employees 641
Plant Area 430,000
ft2
Annual Production 43,608,386
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $728,207 26,877,600
kWh
Electricity Demand $1,194,817 53,467
kW-mo/yr
Electricity Fees $117,361 -
Natural Gas $32,986 3,324
MMBtu
TOTAL YEARLY COSTS $2,073,371
RECOMMENDED SAVINGS* $618,932 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,490 $11,516 $6,925
256,478
kWh
$10,565
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $83,199 $100,000 - - $83,199
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $80,954 $524,616 $80,954
2,998,283
kWh
- -
04 2.9114: Use solar heat to make electricty $427,303 $4,465,290 $168,399
6,237,013
kWh
$258,904
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $9,986 - $9,986
369,847
kWh
- -
TOTAL RECOMMENDED $618,932 $5,101,422 $266,264
9,861,621
kWh
$269,469
-
kW-mo/yr
$83,199
TOTAL IMPLEMENTED $27,476 $11,516 $16,911
626,325
kWh
$10,565
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs