ITAC Assessment: ND0360
ITAC logo
ITAC Assessment: ND0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Metal Weldings
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 315
Plant Area 120,000
ft2
Annual Production 35,500
pieces
Production Hrs. Annual 4,550
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,704 3,335,580
kWh
Electricity Demand $77,460 8,659
kW-mo/yr
Electricity Fees $15,864 -
Natural Gas $46,300 24,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $886 $3,912 $793
9,086
kWh
$93
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $1,495 - $913
25,791
kWh
$482
-
kW-mo/yr
- - $100
03 2.7142: Utilize higher efficiency lamps and/or ballasts $611 $730 $113
3,517
kWh
$42
-
kW-mo/yr
- $245 $211
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,809 $80 $1,353
26,377
kWh
$456
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,566 $560 $1,566
31,360
kWh
- - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $337 $300 $452
11,723
kWh
$107
-
kW-mo/yr
$(-222.0)
-
MMBtu
- -
07 2.2211: Use optimum temperature $86 $20 $86
2,345
kWh
- - - -
TOTAL RECOMMENDED $6,790 $5,602 $5,276
110,199
kWh
$1,180
-
kW-mo/yr
$(-222.0)
-
MMBtu
$245 $311
TOTAL IMPLEMENTED $1,652 $580 $1,652
33,705
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs