Assessment Year | 2000 |
---|---|
Principal Product | Metal Weldings |
NAICS |
n/a
|
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $10 M to 50M |
# of Employees | 315 |
Plant Area |
120,000
ft2
|
Annual Production | 35,500
pieces
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $225,704 | 3,335,580 |
kWh
|
$0.068 |
Electricity Demand | $77,460 | 8,659 |
kW-mo/yr
|
$8.95 |
Electricity Fees | $15,864 | - |
|
- |
Natural Gas | $46,300 | 24,690 |
MMBtu
|
$1.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,790 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,652 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $886 | $3,912 |
$793
9,086
kWh
|
$93
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,495 | - |
$913
25,791
kWh
|
$482
-
kW-mo/yr
|
- | - | $100 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $611 | $730 |
$113
3,517
kWh
|
$42
-
kW-mo/yr
|
- | $245 | $211 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,809 | $80 |
$1,353
26,377
kWh
|
$456
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,566 | $560 |
$1,566
31,360
kWh
|
- | - | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $337 | $300 |
$452
11,723
kWh
|
$107
-
kW-mo/yr
|
$(-222.0)
-
MMBtu
|
- | - | |
07 | 2.2211: Use optimum temperature | $86 | $20 |
$86
2,345
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $6,790 | $5,602 |
$5,276
110,199
kWh
|
$1,180
-
kW-mo/yr
|
$(-222.0)
-
MMBtu
|
$245 | $311 | ||
TOTAL IMPLEMENTED | $1,652 | $580 |
$1,652
33,705
kWh
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs