ITAC Assessment: UL2203
ITAC logo
ITAC Assessment: UL2203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bakery products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 120,000
ft2
Annual Production 131,348,658
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,022 11,284,920
kWh
Electricity Demand $466,214 29,460
kW-mo/yr
Electricity Fees $105,618 -
Natural Gas $472,556 170,129
MMBtu
TOTAL YEARLY COSTS $1,332,410
RECOMMENDED SAVINGS* $157,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $123,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $37,530 $37,026 $20,078
772,227
kWh
$17,452
-
kW-mo/yr
02 2.7135: Install occupancy sensors $2,063 $4,340 $2,063
79,346
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,985 - $2,998
115,313
kWh
$3,987
-
kW-mo/yr
04 2.4226: Use / purchase optimum sized compressor $4,720 $15,000 $4,436
170,608
kWh
$284
-
kW-mo/yr
05 2.3212: Optimize plant power factor $79,271 $45,460 - $79,271
-
kW-mo/yr
06 2.9114: Use solar heat to make electricty $26,616 $369,011 $11,467
449,692
kWh
$15,149
-
kW-mo/yr
TOTAL RECOMMENDED $157,185 $470,837 $41,042
1,587,186
kWh
$116,143
-
kW-mo/yr
TOTAL IMPLEMENTED $123,786 $82,486 $23,076
887,540
kWh
$100,710
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs