ITAC Assessment: UL0248
ITAC logo
ITAC Assessment: UL0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Salted nuts, dry pack mix
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 295
Plant Area 158,000
ft2
Annual Production 41,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $428,976 9,902,990
kWh
Electricity Demand $150,493 16,659
kW-mo/yr
Natural Gas $124,439 31,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,538

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,938 $15,352 $1,803
41,706
kWh
$539
-
kW-mo/yr
- $3,596
02 3.3122: Use filtration, centrifuging to remove contaminants $51,600 $6,600 - - $51,600
-
gal
-
03 4.111: Add equipment/ operators to reduce production bottleneck $28,000 $3,318 - - - $28,000
TOTAL RECOMMENDED $85,538 $25,270 $1,803
41,706
kWh
$539
-
kW-mo/yr
$51,600
-
gal
$31,596
TOTAL IMPLEMENTED $57,538 $21,952 $1,803
41,706
kWh
$539
-
kW-mo/yr
$51,600
-
gal
$3,596
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs