ITAC Assessment: UL0242
ITAC logo
ITAC Assessment: UL0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Powder Coated Parts
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 40,000
ft2
Annual Production 32,400,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,497 2,899,766
kWh
Electricity Demand $38,523 8,076
kW-mo/yr
Natural Gas $35,514 5,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,646 $9,827 n/a $1,323
32,532
kWh
$323
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,135 $20 n/a $1,718
41,911
kWh
$417
-
kW-mo/yr
- -
03 3.5316: Contract a wood pallet recycling company $19,623 - n/a - - $19,623
-
lb
-
04 4.421: Modify current incentive program $1,947 $60 n/a - - - $1,947
TOTAL RECOMMENDED $25,351 $9,907 $3,041
74,443
kWh
$740
-
kW-mo/yr
$19,623
-
lb
$1,947
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs