ITAC Assessment: UL0241
ITAC logo
ITAC Assessment: UL0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Unglazed ceramic tile
NAICS
n/a
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,298 11,666,178
kWh
Electricity Demand $177,658 19,600
kW-mo/yr
Natural Gas $970,122 399,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $24,726 $16,605 $24,726
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $34,297 $19,628 - $34,297
-
MMBtu
-
03 4.445: Install equipment to move product $57,400 $38,400 - - $57,400
04 4.126: Install sensors to detect defects $6,583 $30,160 - - $6,583
TOTAL RECOMMENDED $123,006 $104,793 $24,726
-
kW-mo/yr
$34,297
-
MMBtu
$63,983
TOTAL IMPLEMENTED $24,726 $16,605 $24,726
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs