ITAC Assessment: UL0231
ITAC logo
ITAC Assessment: UL0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rolled Carbon Steel
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 55,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,732
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,936 1,831,770
kWh
Electricity Demand $41,755 4,506
kW-mo/yr
Natural Gas $19,729 4,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,275 $101 $1,307
53,341
kWh
$968
-
kW-mo/yr
- -
02 3.6192: Use a less expensive method of waste removal $757 - - - $757
-
lb
-
03 3.6192: Use a less expensive method of waste removal $876 - - - - $876
04 4.514: Re-arrange equipment layout to reduce handling costs $36,750 $23,166 - - - $36,750
TOTAL RECOMMENDED $40,658 $23,267 $1,307
53,341
kWh
$968
-
kW-mo/yr
$757
-
lb
$37,626
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs