Assessment Year | 2000 |
---|---|
Principal Product | Automobilr engines and components |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
300
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,919 | 3,461,606 |
kWh
|
$0.027 |
Electricity Demand | $102,533 | 11,085 |
kW-mo/yr
|
$9.25 |
Natural Gas | $49,887 | 12,680 |
MMBtu
|
$3.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $399,017 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $95,940 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,394 | $40 |
$2,254
83,822
kWh
|
$4,140
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,353 | $500 |
$1,353
50,410
kWh
|
- | - | - | |
03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,860 | - | - | - |
$2,860
-
lb
|
- | |
04 | 3.6192: Use a less expensive method of waste removal | $1,447 | - | - | - | - | $1,447 | |
05 | 2.3192: Use fossil fuel powered generator during peak demand periods | $297,462 | $167,000 | - | - | - | $297,462 | |
06 | 4.322: Eliminate old stock and modify inventory control | $83,800 | $80,000 | - | - | - | $83,800 | |
07 | 4.321: Optimize production lot sizes and inventories | $1,500 | - | - | - | - | $1,500 | |
08 | 4.321: Optimize production lot sizes and inventories | $2,893 | $2,120 | - | - | - | $2,893 | |
09 | 4.515: Install shelves / racks to utilize unused space | $1,308 | $2,270 | - | - | - | $1,308 | |
TOTAL RECOMMENDED | $399,017 | $251,930 |
$3,607
134,232
kWh
|
$4,140
-
kW-mo/yr
|
$2,860
-
lb
|
$388,410 | ||
TOTAL IMPLEMENTED | $95,940 | $82,660 |
$3,607
134,232
kWh
|
$4,140
-
kW-mo/yr
|
- | $88,193 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs