ITAC Assessment: UL0230
ITAC logo
ITAC Assessment: UL0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Automobilr engines and components
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 300
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,919 3,461,606
kWh
Electricity Demand $102,533 11,085
kW-mo/yr
Natural Gas $49,887 12,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $399,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,394 $40 $2,254
83,822
kWh
$4,140
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,353 $500 $1,353
50,410
kWh
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,860 - - - $2,860
-
lb
-
04 3.6192: Use a less expensive method of waste removal $1,447 - - - - $1,447
05 2.3192: Use fossil fuel powered generator during peak demand periods $297,462 $167,000 - - - $297,462
06 4.322: Eliminate old stock and modify inventory control $83,800 $80,000 - - - $83,800
07 4.321: Optimize production lot sizes and inventories $1,500 - - - - $1,500
08 4.321: Optimize production lot sizes and inventories $2,893 $2,120 - - - $2,893
09 4.515: Install shelves / racks to utilize unused space $1,308 $2,270 - - - $1,308
TOTAL RECOMMENDED $399,017 $251,930 $3,607
134,232
kWh
$4,140
-
kW-mo/yr
$2,860
-
lb
$388,410
TOTAL IMPLEMENTED $95,940 $82,660 $3,607
134,232
kWh
$4,140
-
kW-mo/yr
- $88,193
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs