ITAC Assessment: UL0222
ITAC logo
ITAC Assessment: UL0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Carbon and stainless steel fabricated products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 75,500
ft2
Annual Production 4,465
ton
Production Hrs. Annual 2,040
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,770 1,127,784
kWh
Electricity Demand $16,337 3,661
kW-mo/yr
Natural Gas $20,302 3,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,305 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,326 $20 $694
24,033
kWh
$632
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,708 $8,456 $1,424
48,945
kWh
$1,284
-
kW-mo/yr
- - -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $16,091 $8,165 - - - $16,091
-
lb
-
04 3.5217: Reuse / recycle/ sell paper products $200 $150 - - - $200
-
lb
-
05 3.7214: Reduce or eliminate waste $15,966 $1,448 - - $15,966
-
gal
- -
06 3.2121: Convert to electrostatic powder coating $32,230 $13,000 - - $32,230
-
gal
- -
07 3.7214: Reduce or eliminate waste $55,904 $285,000 - - $55,904
-
gal
- -
08 4.445: Install equipment to move product $53,880 - - - - - $53,880
TOTAL RECOMMENDED $178,305 $316,239 $2,118
72,978
kWh
$1,916
-
kW-mo/yr
$104,100
-
gal
$16,291
-
lb
$53,880
TOTAL IMPLEMENTED $72,554 $9,904 $1,424
48,945
kWh
$1,284
-
kW-mo/yr
$15,966
-
gal
- $53,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs