ITAC Assessment: UL0213
ITAC logo
ITAC Assessment: UL0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Soybean meal, grain, oil
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range n/a
# of Employees 155
Plant Area 120,000
ft2
Annual Production 0
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,303,998 40,160,903
kWh
Electricity Demand $91,028 72,290
kW-mo/yr
Coal $1,170,640 658,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $115,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7224: Reduce space conditioning during non-working hours $1,043 $875 $1,043
-
MMBtu
- -
02 3.4131: Minimize contamination of water before treatment $21,700 $25,000 - $21,700 -
03 4.122: Develop standard procedures to improve internal yields $93,500 $12,000 - - $93,500
TOTAL RECOMMENDED $116,243 $37,875 $1,043
-
MMBtu
$21,700 $93,500
TOTAL IMPLEMENTED $115,200 $37,000 - $21,700 $93,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs