ITAC Assessment: UL0210
ITAC logo
ITAC Assessment: UL0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Adult Diapers
NAICS
n/a
SIC 2676: Sanitary Paper Products
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 355,560
ft2
Annual Production 270,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $504,566 18,811,841
kWh
Electricity Demand $543,209 49,608
kW-mo/yr
Natural Gas $58,528 8,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $209,038 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,828 $10,925 $3,849
132,181
kWh
$2,979
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $80,210 $43,420 - $80,210
-
kW-mo/yr
- -
03 3.5217: Reuse / recycle/ sell paper products $22,000 - - - $22,000
-
lb
-
04 4.652: Replace existing equipment with more suitable substitutes $100,000 $200,000 - - - $100,000
TOTAL RECOMMENDED $209,038 $254,345 $3,849
132,181
kWh
$83,189
-
kW-mo/yr
$22,000
-
lb
$100,000
TOTAL IMPLEMENTED $22,000 - - - $22,000
-
lb
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs