ITAC Assessment: UL0201
ITAC logo
ITAC Assessment: UL0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product automotive engine head gasket
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $50
M
to 100
M
# of Employees 201
Plant Area 69,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,905 8,168,816
kWh
Electricity Demand $68,224 1,365
kW-mo/yr
Natural Gas $40,679 8,020
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,025,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $342,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $958 $3,132 - $958
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,962 $1,518 $3,017
105,803
kWh
$945
-
kW-mo/yr
- - -
03 3.3131: Use evaporation to concentrate material $2,084 $5,160 - - - $2,084
-
lb
-
04 3.7135: Minimize use of rags through worker training $4,045 $1,125 - - - $4,045
-
lb
-
05 3.5248: Separate and recycle scrap metal to foundry or for sale $672,266 $138,250 - - $672,266
-
lb
- -
06 4.112: Replace old machine with new automatic multi-station tool $342,000 $12,150 - - - - $342,000
TOTAL RECOMMENDED $1,025,315 $161,335 $3,017
105,803
kWh
$1,903
-
kW-mo/yr
$672,266
-
lb
$6,129
-
lb
$342,000
TOTAL IMPLEMENTED $342,958 $15,282 - $958
-
kW-mo/yr
- - $342,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs