ITAC Assessment: UL0196
ITAC logo
ITAC Assessment: UL0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product biscuits, hotcakes
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 215,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 8,320
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $888,551 32,269,051
kWh
Natural Gas $303,067 81,689
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $7,123 $20 $7,123
258,793
kWh
- - -
02 4.122: Develop standard procedures to improve internal yields $10,845 $13,500 - - $10,845 -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $2,772 - - $2,772
-
lb
- -
04 4.122: Develop standard procedures to improve internal yields $100,000 $10,000 - - - $100,000
TOTAL RECOMMENDED $120,740 $23,520 $7,123
258,793
kWh
$2,772
-
lb
$10,845 $100,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs