ITAC Assessment: UL0174
ITAC logo
ITAC Assessment: UL0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 140,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,677 6,451,934
kWh
Electricity Demand $227,890 17,856
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $606 $3,052 $280
13,775
kWh
$326
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $185 $5,640 $84
4,103
kWh
$101
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $54,283 $26,194 - $54,283
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $872 $20 $396
19,343
kWh
$476
-
kW-mo/yr
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $550 - - - - - $550
-
lb
06 3.8143: Recycle cleaning solvent and reuse $6,760 $9,845 - - - $6,760
-
gal
-
07 3.4111: Use closed cycle process to minimize waste water production $7,302 $2,536 - - $7,302
-
Tgal
- -
TOTAL RECOMMENDED $70,558 $47,287 $760
37,221
kWh
$55,186
-
kW-mo/yr
$7,302
-
Tgal
$6,760
-
gal
$550
-
lb
TOTAL IMPLEMENTED $61,228 $41,679 $84
4,103
kWh
$54,384
-
kW-mo/yr
- $6,760
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs