Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Vinyl Wall Coverings
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 52,000
ft2
Annual Production 44,550
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,579 882,474
kWh
Electricity Demand $31,259 3,154
kW-mo/yr
Electricity Fees $2,034 -
Natural Gas $24,611 6,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $6,726 $7,330 - $6,726
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $937 $636 $561
22,860
kWh
$376
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $199 $20 $127
5,275
kWh
$72
-
kW-mo/yr
- - -
04 3.6192: Use a less expensive method of waste removal $3,360 $200 - - - $3,360
-
lb
-
05 3.7131: Use a rag recycle service $3,217 $2,200 - - $3,217
-
lb
- -
06 4.222: Purchase re-conditioned material instead of new $960 - - - - - $960
07 3.5248: Separate and recycle scrap metal to foundry or for sale $1,829 $1,500 - - $1,829
-
lb
- -
TOTAL RECOMMENDED $17,228 $11,886 $688
28,135
kWh
$7,174
-
kW-mo/yr
$5,046
-
lb
$3,360
-
lb
$960
TOTAL IMPLEMENTED $12,852 $9,666 $561
22,860
kWh
$7,102
-
kW-mo/yr
$1,829
-
lb
$3,360
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs