ITAC Assessment: UL0165
ITAC logo
ITAC Assessment: UL0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wood Office Furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 124,635
ft2
Annual Production 18,780
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,984 1,109,320
kWh
Natural Gas $24,894 5,748
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,617

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $489 $795 $489
7,620
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $135 $40 $135
2,052
kWh
- - -
03 2.4133: Use most efficient type of electric motors $197 $3,920 $197
2,931
kWh
- - -
04 3.1191: Change procedures / equipment / operating conditions $11,447 - - $267
-
lb
$5,200 $5,980
05 3.1191: Change procedures / equipment / operating conditions $125,796 $67,000 - $218
-
lb
$8,401 $117,177
TOTAL RECOMMENDED $138,064 $71,755 $821
12,603
kWh
$485
-
lb
$13,601 $123,157
TOTAL IMPLEMENTED $126,617 $71,755 $821
12,603
kWh
$218
-
lb
$8,401 $117,177
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs