ITAC Assessment: UL0164
ITAC logo
ITAC Assessment: UL0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wood Office Furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 138,560
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 5,250
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,277 2,358,441
kWh
Natural Gas $7,254 1,538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $278 $11,520 $278
4,396
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,091 $2,901 $2,091
33,118
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $984 $60 $984
15,533
kWh
- - -
04 3.1191: Change procedures / equipment / operating conditions $5,547 - - $131
-
lb
$2,522 $2,894
05 3.1191: Change procedures / equipment / operating conditions $40,316 $31,000 - $109
-
lb
$3,841 $36,366
TOTAL RECOMMENDED $49,216 $45,481 $3,353
53,047
kWh
$240
-
lb
$6,363 $39,260
TOTAL IMPLEMENTED $43,669 $45,481 $3,353
53,047
kWh
$109
-
lb
$3,841 $36,366
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs