ITAC Assessment: UL0146
ITAC logo
ITAC Assessment: UL0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Finished Wood Products
NAICS
n/a
SIC 2526:
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 165,000
ft2
Annual Production 1,600
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,736 5,442,263
kWh
Electricity Demand $150,826 13,914
kW-mo/yr
Electricity Fees $5,956 -
Natural Gas $917 205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,135 $3,310 n/a $1,053
20,809
kWh
$1,082
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $3,988 $8,930 n/a $1,419
55,686
kWh
$2,569
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,378 $20 n/a $926
36,342
kWh
$452
-
kW-mo/yr
-
04 3.5311: Recover and reuse waste material $12,300 $12,500 n/a - - $12,300
-
lb
05 3.5313: Increase amount of waste recovered for resale $450 - n/a - - $450
-
lb
06 3.7131: Use a rag recycle service $2,360 $50 n/a - - $2,360
-
lb
TOTAL RECOMMENDED $22,611 $24,810 $3,398
112,837
kWh
$4,103
-
kW-mo/yr
$15,110
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs