Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Paint Dispersions
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 62,000
ft2
Annual Production 400
Tgal
Production Hrs. Annual 2,500
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,380 1,473,036
kWh
Natural Gas $24,124 6,106
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,416 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $922 - $922
15,533
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,808 $4,595 $3,808
64,185
kWh
-
03 2.3212: Optimize plant power factor $11,418 $5,400 $11,418
-
kWh
-
04 2.3212: Optimize plant power factor $17,564 $10,120 $17,564
-
kWh
-
05 2.1223: Install smaller boiler (increase high fire duty cycle) $4,704 $20,700 - $4,704
-
MMBtu
TOTAL RECOMMENDED $38,416 $40,815 $33,712
79,718
kWh
$4,704
-
MMBtu
TOTAL IMPLEMENTED - - - -