| Assessment Year | 1995 |
|---|---|
| Principal Product | Paint Dispersions |
| NAICS |
n/a
|
| SIC | 3711: Motor Vehicles and Passenger Car Bodies |
| Sales Range | $10 M to 50M |
| # of Employees | 12 |
| Plant Area |
62,000
ft2
|
| Annual Production | 400
Tgal
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,380 | 1,473,036 |
kWh
|
$0.059 |
| Natural Gas | $24,124 | 6,106 |
MMBtu
|
$3.95 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,416 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $922 | - |
$922
15,533
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,808 | $4,595 |
$3,808
64,185
kWh
|
- | |
| 03 | 2.3212: Optimize plant power factor | $11,418 | $5,400 |
$11,418
-
kWh
|
- | |
| 04 | 2.3212: Optimize plant power factor | $17,564 | $10,120 |
$17,564
-
kWh
|
- | |
| 05 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $4,704 | $20,700 | - |
$4,704
-
MMBtu
|
|
| TOTAL RECOMMENDED | $38,416 | $40,815 |
$33,712
79,718
kWh
|
$4,704
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs