ITAC Assessment: UL0129
ITAC logo
ITAC Assessment: UL0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Molded Rubber Parts
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 56,000
ft2
Annual Production 78,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $726,961 13,771,688
kWh
Natural Gas $10,828 1,693
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $14,701 $28,760 $14,701
297,479
kWh
02 2.3212: Optimize plant power factor $1,872 $5,845 $1,872
-
kWh
03 2.3212: Optimize plant power factor $6,854 $19,804 $6,854
-
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,502 $2,111 $4,502
85,287
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,713 $40 $1,713
32,532
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,502 $10 $1,502
28,429
kWh
TOTAL RECOMMENDED $31,144 $56,570 $31,144
443,727
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs