ITAC Assessment: UL0125
ITAC logo
ITAC Assessment: UL0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Conveyors
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 182
Plant Area 99,000
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,075 2,065,651
kWh
Natural Gas $91,761 22,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,046 $40 $1,046
18,757
kWh
02 2.4133: Use most efficient type of electric motors $1,740 $2,950 $1,740
31,067
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,534 $1,249 $1,534
25,498
kWh
04 2.3212: Optimize plant power factor $3,591 $3,400 $3,591
-
kWh
05 2.3212: Optimize plant power factor $8,519 $6,450 $8,519
-
kWh
TOTAL RECOMMENDED $16,430 $14,089 $16,430
75,322
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs