Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Bulk Baking Products
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range greater than $500
M
# of Employees 120
Plant Area 120,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,134 5,431,419
kWh
Natural Gas $103,757 27,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $5,153 $2,000 - $5,153
-
MMBtu
02 2.4133: Use most efficient type of electric motors $5,441 $11,540 $5,441
110,785
kWh
-
03 2.3212: Optimize plant power factor $5,493 $11,600 $5,493
-
kWh
-
04 2.3212: Optimize plant power factor $18,601 $16,000 $18,601
-
kWh
-
TOTAL RECOMMENDED $34,688 $41,140 $29,535
110,785
kWh
$5,153
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs