ITAC Assessment: GT0149
ITAC logo
ITAC Assessment: GT0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product FOAM PADDING
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $5
M
to 10
M
# of Employees 94
Plant Area
n/a
Annual Production 54,685
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,590 1,235,932
kWh
Natural Gas $21,240 4,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2122: Install / repair insulation on condensate lines $81 $110 - $81
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $345 $840 $345
6,448
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $608 $904 $608
11,137
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,725 $75 $2,725
49,824
kWh
-
05 2.4133: Use most efficient type of electric motors $1,503 $5,997 $1,503
27,550
kWh
-
TOTAL RECOMMENDED $5,262 $7,926 $5,181
94,959
kWh
$81
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs