ITAC Assessment: UL0109
ITAC logo
ITAC Assessment: UL0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Phenolic Resin
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 165,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $922,857 24,131,888
kWh
Natural Gas $734,784 200,192
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $1,770 $368 - $1,770
-
MMBtu
02 2.4133: Use most efficient type of electric motors $23,541 $68,870 $23,541
615,475
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,055 - - $4,055
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,252 - - $2,252
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,348 $510 $2,348
61,841
kWh
-
06 2.2514: Cover open tanks $3,013 $2,104 - $3,013
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $476 $1,030 $476
12,603
kWh
-
TOTAL RECOMMENDED $37,455 $72,882 $26,365
689,919
kWh
$11,090
-
MMBtu
TOTAL IMPLEMENTED $27,030 $72,004 $24,017
628,078
kWh
$3,013
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs