ITAC Assessment: OR0012
ITAC logo
ITAC Assessment: OR0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product DAIRY PRODUCTS.
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area
n/a
Annual Production 57,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,728 1,527,257
kWh
Natural Gas $44,036 10,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $4,976 - $4,976
100,528
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $545 - $545
11,137
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $819 $326 $819
16,413
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $822 $300 - $822
-
MMBtu
05 2.2437: Recover waste heat from equipment $6,675 $132 $135
2,638
kWh
$6,540
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $2,968 $2,925 - $2,968
-
MMBtu
07 2.4133: Use most efficient type of electric motors $179 $208 $179
3,517
kWh
-
08 2.1213: Direct warmest air to combustion intake $551 $600 - $551
-
MMBtu
09 2.7292: Lower ceiling to reduce conditioned space $5,021 $8,513 - $5,021
-
MMBtu
TOTAL RECOMMENDED $22,556 $13,004 $6,654
134,233
kWh
$15,902
-
MMBtu
TOTAL IMPLEMENTED $6,343 $300 $5,521
111,665
kWh
$822
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs