ITAC Assessment: UL0106
ITAC logo
ITAC Assessment: UL0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Buttons and Fasteners
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $50
M
to 100
M
# of Employees 425
Plant Area 168,000
ft2
Annual Production 1,750,000,000
pieces
Production Hrs. Annual 6,624
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $429,749 10,050,117
kWh
Natural Gas $36,062 10,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $243 $36 $243
6,155
kWh
-
02 2.4133: Use most efficient type of electric motors $4,971 $8,620 $4,971
122,802
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,428 $3,203 $1,428
35,756
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,326 $2,000 - $4,326
-
MMBtu
05 2.3212: Optimize plant power factor $626 $1,084 $626
-
kWh
-
06 2.3212: Optimize plant power factor $2,436 $9,204 $2,436
-
kWh
-
TOTAL RECOMMENDED $14,030 $24,147 $9,704
164,713
kWh
$4,326
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs