Assessment Year | 1994 |
---|---|
Principal Product | Porcelain Coated Metal |
NAICS |
n/a
|
SIC | 3465: Automotive Stampings |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
93,000
ft2
|
Annual Production | 190,000
lb
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $205,574 | 3,617,820 |
kWh
|
$0.057 |
Natural Gas | $190,097 | 50,971 |
MMBtu
|
$3.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,558 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,975 | $8,590 | n/a |
$3,975
85,873
kWh
|
- |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,444 | $696 | n/a |
$5,444
95,545
kWh
|
- |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,055 | $3,163 | n/a |
$2,055
36,049
kWh
|
- |
04 | 2.4221: Install compressor air intakes in coolest locations | $420 | $150 | n/a |
$420
7,327
kWh
|
- |
05 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $3,325 | $10,000 | n/a | - |
$3,325
-
MMBtu
|
06 | 2.2511: Insulate bare equipment | $791 | $588 | n/a | - |
$791
-
MMBtu
|
07 | 2.1114: Limit and control secondary combustion air in furnace | $3,085 | $1,000 | n/a | - |
$3,085
-
MMBtu
|
08 | 2.2511: Insulate bare equipment | $463 | $558 | n/a | - |
$463
-
MMBtu
|
TOTAL RECOMMENDED | $19,558 | $24,745 |
$11,894
224,794
kWh
|
$7,664
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs