ITAC Assessment: UL0101
ITAC logo
ITAC Assessment: UL0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Porcelain Coated Metal
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 93,000
ft2
Annual Production 190,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,574 3,617,820
kWh
Natural Gas $190,097 50,971
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,975 $8,590 n/a $3,975
85,873
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,444 $696 n/a $5,444
95,545
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,055 $3,163 n/a $2,055
36,049
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $420 $150 n/a $420
7,327
kWh
-
05 2.1223: Install smaller boiler (increase high fire duty cycle) $3,325 $10,000 n/a - $3,325
-
MMBtu
06 2.2511: Insulate bare equipment $791 $588 n/a - $791
-
MMBtu
07 2.1114: Limit and control secondary combustion air in furnace $3,085 $1,000 n/a - $3,085
-
MMBtu
08 2.2511: Insulate bare equipment $463 $558 n/a - $463
-
MMBtu
TOTAL RECOMMENDED $19,558 $24,745 $11,894
224,794
kWh
$7,664
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs