Assessment Year | 2018 |
---|---|
Principal Product | Roll Formed Shapes |
NAICS | 332114: Custom Roll Forming |
SIC | 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
80,000
ft2
|
Annual Production | 14,400,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,513 | 4,948,200 |
kWh
|
$0.033 |
Electricity Demand | $184,462 | 12,214 |
kW-mo/yr
|
$15.10 |
Electricity Fees | $9,524 | - |
|
- |
Natural Gas | $38,982 | 5,589 |
MMBtu
|
$6.97 |
TOTAL YEARLY COSTS | $396,481 | |||
RECOMMENDED SAVINGS* | $23,639 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $3,721 | $2,250 |
$3,721
112,755
kWh
|
- | |
02 | 3.1161: Eliminate/reduce an operation | $2,899 | - |
$1,540
46,649
kWh
|
$1,359
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,133 | $2,270 |
$6,133
185,839
kWh
|
- | |
04 | 2.7224: Reduce space conditioning during non-working hours | $372 | - |
$372
11,270
kWh
|
- | |
05 | 2.7311: Ventilation system to shut off when room is not in use | $2,503 | - |
$1,216
36,852
kWh
|
$1,287
-
kW-mo/yr
|
|
06 | 2.2442: Preheat combustion air with waste heat | $5,397 | $3,780 |
$2,625
79,560
kWh
|
$2,772
-
kW-mo/yr
|
|
07 | 2.7135: Install occupancy sensors | $2,332 | $4,270 |
$2,332
70,655
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $282 | $164 |
$137
4,160
kWh
|
$145
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $23,639 | $12,734 |
$18,076
547,740
kWh
|
$5,563
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $11,250 | $6,704 |
$9,818
297,506
kWh
|
$1,432
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs