| Assessment Year | 2018 |
|---|---|
| Principal Product | Plastic Products |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 190 |
| Plant Area |
80,000
ft2
|
| Annual Production | 28,757,305
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $68,197 | 1,974,000 |
kWh
|
$0.035 | |
| Electricity Demand | $114,560 | 8,595 |
kW-mo/yr
|
$13.33 | |
| Electricity Fees | $4,407 | - |
|
- | |
| Natural Gas | $14,061 | 2,027 |
MMBtu
|
$6.94 | |
| Waste Disposal Costs | |||||
| Water Usage | $287 | 123 |
Tgal
|
$2.33 | |
| Water Disposal | $215 | 123 |
Tgal
|
$1.75 | |
| TOTAL YEARLY COSTS | $201,727 | ||||
| RECOMMENDED SAVINGS* | $45,819 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $288 | $601 |
$189
5,397
kWh
|
$99
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7135: Install occupancy sensors | $2,317 | $3,179 |
$2,317
66,207
kWh
|
- | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,688 | $18,720 |
$3,490
99,727
kWh
|
$7,198
-
kW-mo/yr
|
- | - | - | |
| 04 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,147 | $1,316 | - | - | - |
$1,147
-
Tgal
|
- | |
| 05 | 2.4151: Develop a repair/replace policy | $409 | $570 |
$128
3,661
kWh
|
$281
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $495 | $1,250 |
$495
14,147
kWh
|
- | - | - | - | |
| 07 | 2.2511: Insulate bare equipment | $338 | $365 |
$125
3,567
kWh
|
$213
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,637 | $750 | - | - |
$2,637
-
MMBtu
|
- | - | |
| 09 | 4.423: Move product using mechanical means | $27,500 | $19,000 | - | - | - | - | $27,500 | |
| TOTAL RECOMMENDED | $45,819 | $45,751 |
$6,744
192,706
kWh
|
$7,791
-
kW-mo/yr
|
$2,637
-
MMBtu
|
$1,147
-
Tgal
|
$27,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs