ITAC Assessment: UK1610
ITAC logo
ITAC Assessment: UK1610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Noise, Vibration, and Harshness dampers for automotive purposes
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 120,000
ft2
Annual Production 49,200,000
units
Production Hrs. Annual 4,550
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,351 1,216,495
kWh
Electricity Demand $38,040 4,212
kW-mo/yr
Electricity Fees $2,433 -
Natural Gas $23,600 2,910
MMBtu
TOTAL YEARLY COSTS $152,424
RECOMMENDED SAVINGS* $4,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,688 $4,985 $806
21,614
kWh
$882
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $374 $148 $374
3,220
kWh
- -
03 2.7122: Disconnect ballasts $92 $34 $92
792
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $240 $470 $137
3,679
kWh
$103
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $525 - $525
4,512
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $490 - $490
13,125
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $196 $500 $196
5,250
kWh
- -
08 2.7224: Reduce space conditioning during non-working hours $1,083 $500 $627
16,800
kWh
- $456
-
MMBtu
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $63 - $63
545
kWh
- -
TOTAL RECOMMENDED $4,751 $6,637 $3,310
69,537
kWh
$985
-
kW-mo/yr
$456
-
MMBtu
TOTAL IMPLEMENTED $3,866 $6,133 $2,528
51,396
kWh
$882
-
kW-mo/yr
$456
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs