ITAC Assessment: UK1608
ITAC logo
ITAC Assessment: UK1608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product waste water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 8
Plant Area 700,000
ft2
Annual Production 1,606,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,571 3,023,200
kWh
Electricity Demand $102,589 5,487
kW-mo/yr
Electricity Fees $2,379 -
TOTAL YEARLY COSTS $209,539
RECOMMENDED SAVINGS* $143,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,087

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $125,405 $660,000 $40,009
1,156,320
kWh
$29,620
-
kW-mo/yr
$55,776
-
lb
- -
02 2.4321: Upgrade obsolete equipment $15,087 $75,544 $758
21,900
kWh
$561
-
kW-mo/yr
- $1,768 $12,000
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,569 $9,415 $841
24,295
kWh
$1,728
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $143,061 $744,959 $41,608
1,202,515
kWh
$31,909
-
kW-mo/yr
$55,776
-
lb
$1,768 $12,000
TOTAL IMPLEMENTED $15,087 $75,544 $758
21,900
kWh
$561
-
kW-mo/yr
- $1,768 $12,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs